EV Charger Installation

Project Information

Thorne Electric Company completed a full-scale EV charger installation at a commercial site, featuring ChargePoint units designed to accommodate the growing demand for electric vehicle infrastructure. This project involved installing high-powered EV chargers, which were integrated into the existing electrical infrastructure. The chargers provide efficient and fast charging services to customers, employees, and visitors, ensuring convenient access to sustainable energy solutions. The installation was carried out in line with the latest industry standards, ensuring compliance with all safety protocols and local regulations.

In addition to installing the charging stations, Thorne Electric was responsible for all preparatory work, including trenching, electrical wiring, and conduit installation. The system was tested rigorously to ensure optimal performance and minimal downtime. Our team also provided client training on the proper use and maintenance of the charging units, ensuring long-term reliability.

Overview & Challenge​

This EV charger installation project presented several unique challenges, which Thorne Electric was well-equipped to address. One of the primary challenges was integrating the high-powered charging stations with the site’s existing electrical infrastructure. The site had limited capacity, and our team had to carefully assess load management to prevent overloading the system. Thorne Electric collaborated closely with the site’s management to identify the optimal locations for the chargers, ensuring accessibility while minimizing impact on the parking area layout.

Another significant challenge was coordinating the installation schedule to avoid disrupting daily business operations. Our team worked efficiently and strategically to minimize downtime, completing much of the work during off-peak hours. Additionally, local regulations required careful planning to ensure the installation met all electrical codes and environmental standards, which was achieved through close collaboration with city inspectors and utility companies.

Despite these challenges, the project was completed on time and within budget, providing a seamless and efficient solution for the client’s EV infrastructure needs. This installation will serve as a key component in the client’s sustainability initiatives, offering an eco-friendly solution to both employees and customers while helping to reduce carbon emissions.